Long Upgrade Kit banana posts shielded 12-15/16 leads IEC color coded for pageWriter TC 70. Consisting of 4 additional long lead assy (48" (1.22m)), 6 shorting plugs, 2 lead separators 3.4 diameter, 4 banana post adapters, 6 colored rings, 4 white base rings and instructions for use. The long additions lead sets come pre-assembled with the white base ring and the banana post adapters. 1 kit = 1 sales unit.
Patient Application |
|
---|---|
Application Site |
|
Lead Set Length |
|
Number of Leads |
|
Shielded |
|
Electrode Attachment Method |
|
Color Coding |
|
Use with Non-Philips Healthcare Equipment |
|
---|---|
Use with Philips Healthcare Equipment |
|
Product Category |
|
Product Type |
|
CE Certified |
|
Single-Patient Use OR Multi-Patient Use |
|
Packaging Unit |
|
Not manufactured with natural rubber latex |
|
Minimum Shelf Life |
|
Sterile OR Non-Sterile |
|
Use with Other Supplies |
|
Patient Application |
|
---|---|
Application Site |
|
Use with Non-Philips Healthcare Equipment |
|
---|---|
Use with Philips Healthcare Equipment |
|
Patient Application |
|
---|---|
Application Site |
|
Lead Set Length |
|
Number of Leads |
|
Shielded |
|
Electrode Attachment Method |
|
Color Coding |
|
Use with Non-Philips Healthcare Equipment |
|
---|---|
Use with Philips Healthcare Equipment |
|
Product Category |
|
Product Type |
|
CE Certified |
|
Single-Patient Use OR Multi-Patient Use |
|
Packaging Unit |
|
Not manufactured with natural rubber latex |
|
Minimum Shelf Life |
|
Sterile OR Non-Sterile |
|
Use with Other Supplies |
|
You are about to visit a Philips global content page
ContinueWebová stránka je určena pouze osobám, které jsou odborníky (tj. osobám oprávněným zdravotnické prostředky předepisovat nebo vydávat), nebo zaměstnancům poskytovatele zdravotních služeb.
Jste osobou, která splňuje výše uvedená kritéria? Potvrzujete, že jste seznámeni s rizikem, že pokud budete pokračovat na tyto stránky, aniž jste osobou, která splňuje výše uvedená kritéria, hrozí, že informace tam obsažené budete nevhodně interpretovat a dojdete k mylným závěrům?